The demolition of the main deck bathrooms has been completed and the third deck foyer floor has been completely rebuilt. The fourth deck has been tarped and sealed. The second deck foyer is now watertight.

Visit our Media Center to view the flash video of the demo work that has been done on the main deck. The cabin area on both port and starboard side have been stripped down to the steel. Despite all the years of water damage and neglect, the majority of the structural components are intact and stronger than any of us thought. Sand blasting is to follow soon and then the rebuild of the main deck cabins. A new concession stand will be added at the stern as well as several new features never seen before on the Ste. Claire. Not too worry though, when you walk on the boat next year, she will look the same as you remember her only with a 21st century upgrade.